Termochilca

Termochilca S.A.C. is a natural gas combined-cycle thermoelectric power plant with an installed capacity of 303 MW. Termochilca is located in Chilca, south of Lima, Perú, and started its operation in October 2013.

 

In March 2018 the combined-cycle started its operation, the results of the test indicated that Termochilca is the 4 th most efficient combined-cycle power plant of Peru.

 

Termochilca is strategically located near the gas pipeline of Camisea and the transmission installations of the SEIN (“Sistema Interconectado Nacional” or National Interconected System).